Taishan Construction gold mountain mark
TAISHANCONSTRUCTION
Prepared forTed
ProjectDriveway, Front Yard & Backyard Interlock
ProposalTS-2026-QUOTE-001
Scope for pricingAddress to be confirmed
Drawing: Quote Package
Interlock Reference — reference imageryInterlock Reference — reference imagery

Prepared for Ted by Taishan Construction

Driveway, Front Yard & Backyard Interlock

A complete interlock package,
designed before construction begins.

Address to be confirmedPrepared today

Private proposal

Prepared exclusively for this project.

Prepared for Ted. Each service below is priced as a complete lump-sum investment, and your project total updates as you confirm your selections.

Taishan Construction gold mountain mark
TAISHANDesign-First Exterior Transformation
Proposal statusPricing Review
Prepared forTed
Prepared byTaishan Construction
Site addressAddress to be confirmed
ReferenceQuote Package
Driveway area700 sq. ft.
Frontyard area250 sq. ft.
Backyard area350 sq. ft.
Reference images2 images
Estimated duration5 – 7 days
Last checkedChecking secure access…
Proposal IDTS-2026-QUOTE-001
Project total$16,425.00
VersionV1 — Pricing Review

Reference imagery

See the quality before you build.

Reference images of completed interlock work — your full project catalog will be updated and ready within 24 hours once the scope is confirmed.

Project approach

How Taishan Construction delivers this scope.

A disciplined sequence from mobilization to turnover, coordinated with you.

01

See it before you build it

Your driveway, front yard and backyard visualized and scoped before construction begins.

02

Built properly beneath the surface

Proper excavation, subgrade inspection, geotextile, compacted base and controlled grading beneath every hardscape area.

03

Clear scope, clean execution

Each service is presented as a complete lump sum, so you know exactly what is included before we mobilize.

04

Inspected and turned over

Paver stability, grading and finished edges inspected, deficiencies corrected and a final walkthrough completed.

Scope of work

Build your project scope.

Each service is priced as a complete lump sum. Select the services you would like included and your project total updates instantly. Estimated 5 – 7 day construction schedule.

Driveway surface

Interlock driveway.

700 sq. ft. of new interlock driveway at $13.50 per sq. ft. This is the recommended and selected surface for this project.

Supply and installation of 350 sq. ft. of interlocking pavers in the backyard, including excavation, base preparation, compaction and final finishing.

  • Excavation of the backyard area to the required construction depth
  • Loading, hauling and disposal of excavated material
  • Subgrade inspection, fine grading and compaction
  • Supply and installation of nonwoven geotextile
  • Supply, placement and compaction of aggregate base in controlled lifts
  • Supply and installation of the approved interlock pavers
  • Layout control lines, cutting and fitting at all perimeter conditions
  • Jointing, plate compaction and elimination of rocking units
  • Final cleaning and inspection of the completed surface

Frontyard reinterlock — choose one

Select your frontyard reinterlock option.

Two approaches are available for the 250 sq. ft. frontyard area. Selecting one automatically replaces the other, and your project total updates immediately.

Investment summary

Investment summary.

Every service is presented as a complete lump-sum investment covering all labour, materials, equipment, disposal and cleanup required for that portion of the work.

Quantities are preliminary and subject to field verification, approved material selections, site access, utility conditions, and client confirmation.

Project total — selected services$16,425.00CAD · updates as your selections change
Interlock Driveway$9,450.00Reinterlock with Existing Pavers$2,250.00Backyard Interlocking$4,725.00Site Protection and Final CleanupIncluded

Construction sequence

A 5 – 7 day construction schedule.

Under normal site, weather, access, and material-delivery conditions.

DAY01

Mobilization and Demolition

Site setup, protection, removal of the existing driveway and frontyard surfaces and disposal of debris.

DAY02

Excavation and Subgrade

Driveway, frontyard and backyard excavation, subgrade inspection, fine grading and compaction.

DAY03

Base Preparation

Geotextile and aggregate base placement in controlled lifts with elevation verification.

DAY05

Interlock Installation

Driveway field, frontyard reinterlock and backyard interlock with jointing and edge restraint.

DAY07

Cleanup and Turnover

Final grading, cleanup, pressure wash and walkthrough.

Review and confirmation

Scope review
with Ted

Please review your selected services above and confirm the scope, material selections and site conditions. Your project total reflects the services currently selected.

Note: All quantities are preliminary and subject to field verification, approved material selections, site access, utility conditions, and client confirmation.

Questions? Contact Jeff directly.
Driveway area700 sq. ft. (field verification required)
Frontyard area250 sq. ft. reinterlock (existing or new pavers)
Backyard area350 sq. ft. new interlock
Estimated durationApprox. 5 – 7 working days
ReferenceQuote Package
Driveway surfaceInterlock Driveway
Frontyard reinterlockReinterlock with Existing Pavers
Project total — selected services$16,425.00
Estimated startTo be confirmed